Successful Telemetry System executed at UP’s largest Solar Plant ̶ 75MW
MBCS successfully designed, engineered and commissioned Telemetry System for UP’s largest Solar Plant, 75 MW at Mirzapur district. This plant was inaugurated by Honorable Prime Minister of India, Shri Narendra Modi & French President, Emmanuel Macron on March 12th, 2018.
Built at a cost of Rs.500 crore by French Firm Engle, the 75MW solar plant has come at Dadar Kalan Village on the hilly terrain of the Vindhyas range.
With more than 350+ installations pan India, we are the leading Telemetry System provider and have expertise in different communication mediums like GPRS, Leased Lines, PLCC, OFC & V-SAT.